COST FOR EACH INDIVIDUAL PROJECT IN US $


Repair, recaulking and waterproofing on exterior walls and balconies of the building
   $165 

Replacement of tranformer oil in 5 transformers and filtration of the oil in 5 others

   $35

Maintenence to the main high voltaje electrical substation, emergency power plant, pool filtration system and hot water boilers

    $95
Instalation of water trays for each condo, airconditioner and tubbing to drain the water
    $40
Construction and instalation of a main hot water tank
    $35



IN THE EVENT ALL OF THE ABOVE PROJECTS ARE APPROVED, THE TOTAL ASSESSMENT WOULD BE US$370.00 PER CONDO